Busca Tubo De Cilindro, Tubo De Acero, Tubo De Acero Sin Costura en el directorio Industry, Reliable fabricante / proveedor / fábrica de China

Buzón de Consultas (0)
Home > Lista de Producto > Tubos de acero de precisión > Tubos de acero de precisión para amortiguador > Tubo de acero al carbono de alta calidad para amortiguador de motocicleta

Tubo de acero al carbono de alta calidad para amortiguador de motocicleta

Información básica

Modelo:  HTSP

Descripción del producto

HTSP Técnica: Frío Drawn Tratamiento superficial: Grueso Forma de la sección: Redondo Especificación: 6-68MM Código del HS: 7304391000 Tipo: Inconsútil Material: Acero de carbón Uso: Tubo hidráulico / del automóvil, el amortiguador Marca registrada: HTSP

Product Name

E215 steel pipe

E235 steel pipe

E355  steel pipe

chemical analysis

C: 0.10;Si: 0.05;Mn: 0.70;P: 0.025; S: 0.025;Al: 0.025

C: 0.17;Si: 0.35;Mn: 1.20;P: 0.025; S: 0.025

C: 0.22;Si: 0.55;Mn: 1.60;P: 0.025; S: 0.025

Tensile Strength

+C, 430MPa; +LC, 380MPa;+SR, 380MPa;+A, 280MPa;+N,290-430MPa

+C, 480MPa; +LC, 420MPa;+SR, 420MPa;+A, 315MPa;+N, 340-480MPa

+C, 640MPa; +LC, 580MPa;+SR, 580MPa;+A, 450MPa;+N,490-630MPa

Yield strength

+SR, 280MPa; +N, 215MPa

+SR, 350MPa;

+N, 235MPa

+SR, 450MPa; +N, 355MPa

Standard

EN10305-1

Length

As customer s request

Packaging

Standard export packing, packed in woven bags, with two nylon slings, or can be customized as request

Heat Treatment/      Delivery Condition

  1. Cold finished (hard)   BK(+C)

Tubes do not undergo heat treatment following the final cold forming and, thus, have a rather high resistance to deformation

  1. Cold finished (soft)    BKW(+LC)

The final heat treatment is followed by cold drawing involving limited deformation. Appropriate further processing allows a certain degree of cold forming (e.g. bending, expanding)

  1. Cold finished and stress-relieved annealing BKS(+SR)

Heat treatment is applied following the last cold forming process. Subject to appropriate processing conditions, the increase in the residual stresses involved enables both forming and machining to a certain degree.

  1. Annealed    GBK(+A)

The last Cold forming process is followed by annealing in a controlled atmosphere.

  1. Normalized   NBK(+N)

The last cold forming process is followed by annealing above the upper transformation point in a controlled atmosphere.

Delivery Time

Within 35-50 days from receiving deposit

Payment Term

100% L/C at sight or 30% deposit, 70% balance against copy of B/L

Usage/Application

Pipes for automobile and motorcycle

Main Market

Asia, Middle East, Europe, etc.

Diámetro del DescriptionOuter del producto: 25m m -500m m
Grosor de la pared: 2-50mm
Material: ST52, Q345B, CK20, CK45, SAE1026
Estándar: GB / T8713-88, GB / T3639-2009, DIN2391, EN10305
El Tubo Drenado en Frío puede ser producido de acuerdo con las demandas de los clientes que el grado de precisión puede alcanzar H9 / H11.
Composición material y química
DIN2391 estándar ST52, EN10305 estándar E355, 16Mn, ASTM A106B, C20 / 20 #, CK45
High Quality Carbon Steel Pipe for Motorcycle Shock Absorber
High Quality Carbon Steel Pipe for Motorcycle Shock AbsorberHigh Quality Carbon Steel Pipe for Motorcycle Shock AbsorberHigh Quality Carbon Steel Pipe for Motorcycle Shock Absorber

Grupos de Producto : Tubos de acero de precisión > Tubos de acero de precisión para amortiguador